{ref} is where the reference goes. Leave
it out and the reference is appended to the end. Clear the box to turn reference links
off.A delivery plan you can argue with in the room. Lanes are queues that can only do so much at once, tasks wait on each other, and the date at the top is computed, never typed — so when someone says "could that start later?", you drag it and everyone watches the answer move.
The link is the key. A plan has no login and no owner — anyone holding its link can read and edit it, and the link is the only way back to it. There is no list of your plans and no way to recover one from a lost link. Keep it somewhere you keep things, and share it exactly as widely as you mean to.
Dates are computed from durations, dependencies and how much each team can run at once — so the finish date is an answer, not a field. Every edit reaches everyone looking at the plan immediately; Save writes a version with a note, which is the only description of a change anybody gets later.